In January 2016, the company successfully drilled the Am 23A well targeting the Rudeis reservoir in the Amal concession. The well results were successful with an initial flow rate of 2,400 bbls/day and current production of 2,000 bbls/day, with expected additional reserves totaling 1.1 MMbbls.